?>

GAO Expresses Concerns with KC-46A Development

by: Matthew Potter
March 27, 2012

Category: Boeing, EADS, GAO, KC-X, KC-X Tanker News, Syndicated Industry News | RSS 2.0

The Government Accountability Office (GAO) released a report on the KC-46A new aerial tanker program and expressed some concerns with the schedule. Boeing (BA) won the contract to develop a version of their 767 airliner and deliver 17 aircraft after a long struggle with EADS (EADS:P).

GAO is worried that some of the software that is being developed to control the mission planning, defense and routing of the aircraft is being done at the same time as production and testing. GAO also considers the new fuel boom operating station and control higher risk as it has yet to be demonstrated in normal operating environment and at a high maturity. Similar systems are in use on only 3 tankers operated by non-U.S. military.

The KC-46A contract as expected has had some cost increases and earlier this year the Director, Operational Test & Evaluation (D,OT&E) also expressed that the test schedule was not adequate and the program did not allow enough time for the necessary testing.

The Air Force and Boeing dispute the reports claiming the program is on track and risks manageable.

Read the original post here.

From KC-X Tanker News

Tags: , , , , , , , , ,


| Give a Comment | trackback

No Comments

Leave a Reply

You must be logged in to post a comment.

    Like Us On Facebook

  • Search This Site

    Custom Search
  • Upcoming Events

  • FREE Business Downloads

  • Widget Area

    This is widget area, add your widget here from your widget on appereance on your admin panel

>